The proposed project consists of the replacement of a culvert located beneath I-90. The existing corrugated metal culvert will be replaced by a precast concrete culvert. The proposed culvert will be adjacent to the existing culvert and will be installed by tunneling beneath the highway embankment. The work site will be accessed by installing a temporary roadway adjacent to I-90 Eastbound and an access entrance on I-90 Westbound. The existing stream will be realigned into the proposed culvert and the site and vegetation will be restored as construction is completed.
|