Mass.gov  
Highway Divison Massachusetts Department of transporatation
Whittier Bridge/I-95 Improvement Project

Traffic

Current Traffic Management (July 2018):

Intermittent Ramp closures (see detour routes, below):

  • (1) I-95 Northbound Exit 58A Ramp to Route 110 Eastbound
  • (2) I-95 Northbound Exit 58B Ramp to Route 110 Westbound
  • (3) Route 110 Westbound Ramp to I-95 Southbound
  • (4) Route 110 Ramp to I-95 Northbound
  • (5) I-95 Southbound Exit 58 Ramp to Route 110
  • (6) Route 110 Eastbound Ramp to I-95 Southbound
  • (7) Route 113 Ramp to I-95 Northbound

All ramp closures will be coordinated with adjacent project at Route 113.

Overnight lane closures are from 8:00 PM each night to 5:00 AM the following morning (unless otherwise noted):

Detour Routes

  • (1) Detour I-95 Northbound Exit 58A Ramp to Route 110 Eastbound:
    • Take I-95 Northbound to Exit 60. Turn right onto Main Street. Continue onto Rabbit Road. Continue to Route 110.
  • (2) Detour I-95 Northbound Exit 58B Ramp to Route 110 Westbound:
    • Take I-95 Northbound to Exit 60. Turn right onto Main Street. Continue onto Rabbit Road. Turn right onto Route 110.
  • (3) Detour Route 110 Westbound Ramp to I-95 Southbound:
    • Take Route 110 Westbound turn right onto Elm Street. Turn right onto Monroe Street. Take left onto on-ramp to I-95 Southbound.
  • (4) Detour Route 110 Ramp to I-95 Northbound:
    • Route 110 Eastbound – Take Route 110 Eastbound turn left onto Rabbit Road. Continue onto Main Street. Turn left onto Toll Road and take ramp to I-95 Northbound.
    • Route 110 Westbound – Take Route 110 Westbound turn right onto Elm Street. Turn right onto Monroe Street. Turn left onto Toll Road and take ramp to I-95 Northbound.
  • (5) Detour I-95 Southbound Exit 58 Ramp to Route 110:
    • Proceed on I-95 Southbound to Exit 57. Take left onto Route 113 then left onto Ramp to I-95 Northbound. Take Exit 60 turn right onto Main Street. Continue onto Rabbit Road to Route 110.
  • (6) Detour Route 110 Eastbound Ramp to I-95 Southbound:
    • Proceed on Route 110 Eastbound, turn left onto Rabbit Road. Turn left onto Route 286 then turn right on to I-95 Southbound ramp.
  • (7) Detour Route 113 Ramp to I-95 Northbound:
    • I-95 Southbound to Exit 56. Take left onto South Street then turn left onto I-95 Northbound ramp.

Lane Closures

MassDOT's design/build contractor, Walsh-McCourt JV1, for the Whittier Bridge/I-95 Improvement Project continues working in several areas along the project corridor. Daytime work hours are typically 6 AM to 4 PM. Nighttime work hours are typically 8 PM to 5 AM. A Saturday night shift from 8 PM to 5 AM may be utilized on an as-needed basis. Construction related traffic modifications are listed below. In general, lane closure hours coincide with the hours of work for each shift. There are generally no lane closures on Sundays.

Traffic conditions will be monitored while lane closures are in place.

I-95 southbound:

  • Periodic daytime and nighttime lane closures

I-95 northbound:

  • Periodic daytime and nighttime lane closures

Route 110 eastbound:

  • Periodic daytime and nighttime lane closures

Route 110 westbound:

  • Periodic daytime and nighttime lane closures

The schedule for this major infrastructure project is subject to change without notice. All lane restrictions and closures and construction activities are weather dependent. As is typical with most large construction projects, work may sometimes take place without prior notice; however, MassDOT will make every effort to provide advance notice.