Construction Staging

The proposed roadway construction will be completed via staged construction. It is anticipated that this method for construction will be completed within two to three construction seasons and will have three primary stages. Throughout construction, access to driveways will be maintained. Pedestrian accommodations will also be maintained throughout construction by use of the existing signalized pedestrian crossings, a police detail or introduction of temporary sidewalks and crosswalks.

Traffic Management

The intention is to maintain the current number of lanes on all roadways throughout construction.

Periodic short term lane closures may be required to perform isolated work items, and will be listed on this page.