About This Project


The Magazine Beach Pedestrian Bridge crosses over Memorial Drive in Cambridge at the intersection of Magazine Street. This bridge is a single span steel girder that was constructed in 1953. As part of Patrick-Murray Administration’s $3 billion Accelerated Bridge Program, MassDOT awarded a contract to S & R Corporation of Lowell for the replacement of the existing Pedestrian Bridge.

This project was completed during the summer of 2012.

Purpose and Goals

This project consisted of the complete demolition and replacement of the existing pedestrian bridge over Memorial Drive. This bridge had been severely damaged due to vehicular impact. The new superstructure was designed for a 75-year service life, and included the installation of an over height detection system and ADA compliant ramps and code compliant handrails.

Sequence of Work

Magazine Pedestrian Bridge
The project was sequenced as follows: 

  • Installation of temporary pedestrian crossing and traffic signal
  • Demolition of bridge
  • Excavation of existing and proposed bridge footing
  • Placing concrete at new foundations
  • Erecting structural steel
  • Placing concrete deck
  • Installing bridge railings
  • Site restoration and landscaping  



Project Update


The Magazine Beach Pedestrian Bridge work was completed on Friday, July 28, 2012 and the bridge is open for pedestrian use at all times. 

 

Project Updates

For more information, please use the project feedback e-mail at: dot.feedback.highway@state.ma.us or see Contact Us.

Translation Disabled  | Translation Support
MassDOT Home | About Us | Employment | Contact Us | Site Policies Copyright © 2014 Commonwealth of Massachusetts